How It Works

From Field QR Scan to Closed Permit PDF

EnergyGuard guides every crew member through a structured five-stage lockout lifecycle — enforcing physical safety gates at each step before the next one can begin.

01
ENERGIZEDField Crew

QR Request

A field worker scans the Brady QR label on the switchgear, UPS, ATS, or valve using their smartphone. They enter the MOP / Work Order number and select the full asset or a pre-mapped isolation point subset.

The software automatically flags shared isolation point overlaps across active permits.

02
REQUESTEDLOTO Coordinator

Zero-Volt Verify

The Coordinator physically opens disconnects, applies locks, and verifies zero volts with a meter. They capture lockbox photos and an onsite signoff sheet photo before the permit can advance.

Photographic proof of the lock, physical form, and the LOTO coordinator verification are required as part of LOTO.

03
LOCKED OUTAll Crew Members

Group Holds

Each electrician views the Live Lockout Certificate and both photo sets, places their personal padlock on the physical group lockbox, and taps to sign onto the digital group lockbox.

Digital Group LOTO - Power restoration is blocked while any active holds remain.

04
REMOVAL REQField Crew & Lead

Clear Holds

Each worker removes their tools, reinstalls covers, and removes their personal lock. Every worker releases their digital hold — a live server check confirms the lockbox count before the final hold release notifies the Coordinator.

Hold release requires a live server check of lockbox count.

05
ARCHIVEDLOTO Coordinator

Restore & Archive

The Coordinator authenticates with a single-use Removal Token, verifies the area is clear with guards installed, re-energizes the asset, and the system auto-archives a Closed Permit PDF with the full timeline, roster, and photo links.

Audit record logs include: wait to Isolate time, outage hours, and wait to restore.

Dead-Zone Ready

Works Where Wi-Fi Doesn't

Basement switchgear rooms, concrete electrical vaults, and shielded government facilities present no barrier. EnergyGuard caches the full project equipment catalog on the device at first connection. Workers scan QR tags, submit lockout requests, and queue group holds — all offline. The moment signal returns, the system syncs automatically and resolves any concurrent requests.

Local Equipment Catalog Cache

Full asset and isolation point data stored on-device at first connection.

Offline Outbox Queue

Lockout requests and group holds queue locally and sync in order upon reconnection.

Conflict-Merged Hold Resolution

Concurrent offline requests are resolved automatically — no duplicate permit collisions.

Compliance Output

Every Job Produces a Complete Audit Package

At project completion, EnergyGuard delivers a turnover package: all Closed Permit PDFs sorted by Permit ID, a complete asset-named photo archive, full equipment registry with permit history, and an append-only OSHA audit log — ready for inspection or facility handover.

Closed Permit PDFs

Auto-generated at power restoration with full timeline and photo links.

Immutable Event Ledger

Every state transition logged with server timestamps — exportable for OSHA reviews.

Project Turnover Freeze

QR tags decommissioned at handover — no post-turnover permit creation possible.

Physical Safety Rule: EnergyGuard is a digital verification and coordination layer. A digital permit request or hold never substitutes for hanging a physical personal padlock and tag on the lockbox or energy isolation device and verifying zero volts in person.

Ready to See It Live?

Walk through a real job site scenario with your safety team.

The digital Lockout Tagout platform built for modern construction projects.

Get Started

Ready to modernize your LOTO program? Talk to our team.

Request a Demo